# Enable PMDA Submission Rule Parameter Updates

Learn how to configure your Vault with the latest rule parameter updates for PMDA Submissions.

## About the Feature

In 23R1, Vault Safety introduced support for <a href="/en/lr/01309/">multiple PMDA Submissions from a single Case</a>, with the plan to update the associated Reporting Rule Parameters in a later release. With 23R2, the PMDA Rule Parameters now leverage the new and changed fields, including **Registration Type**, **Infection**, and **Special Report Classification**. In addition, this release introduces the **Previously Localized** Rule Parameter. These updates support PMDA requirements for calculating due dates.

After configuring this feature, see <a href="/en/lr/01250/">Reporting Rule Parameter Reference</a> for more information. 

## Update the Active PMDA ICSR Reporting Rule Set 

Complete the steps below to update the active rule version on the PMDA ICSR Reporting Rule Set:

1. Go to **Business Admin > Objects > Safety Rule Sets > PMDA ICSR Reporting Rule Set**.
2. Select **Edit**.
3. In the **Active Rule Version** field, enter "2".
4. Select **Save**.