Learn how to manage core and local risk measures for your Risk Management Plans.
About Risk Measures
A risk measure is an element of a product’s RMP that identifies a specific risk to be tracked, managed, and measured. Risk measures are created from within an existing Risk Management Plan and are defined as either Core Risk Measures or Local Risk Measures.
Overview
This article explains how to:
Prerequisite
To use Risk Measures, your Admin must configure your Vault for Risk Management.
Create Core Risk Measures
To create the risk measures for a Core Risk Management Plan Version:
- Navigate to Risk Management > Core RMPs > [Core RMP].
- In the Core RMP Versions section, select the required Core RMP Version record. This is usually the latest version.
- In the RMP Risks section, select the required RMP Risk record.
- In the Risk Measures section, create a record for each risk measure associated with the selected RMP Risk record:
- Select Create and in the Create RMP Risk Measure window, select Core Risk Measure.
- Complete the Core Risk Measure fields.
- Select Save.
- In the Documents section of the Core Risk Measure record, upload any related documents for the Risk Measure using the standard document creation process. Use the Risk Management > Risk Measure > Risk Measure Tool document type.
- Repeat steps 3 and 4 to create risk measures for each additional RMP Risk record.
Core Risk Measure Fields
Field | Description |
---|---|
Name | Vault populates this field automatically. |
Minimized Risk | Select the RMP Risk for the Core Risk Measure. |
Indication | Select the MedDRA term for the indication. |
Routine/Additional | Select whether the Core Risk Measure is Routine or Additional. |
Measure Category |
Select the type of risk minimization measure.
The options available depend on the selection you made for the Routine/Additional field. The following options are available for routine Core Risk Measures:
The following options are available for additional Core Risk Measures:
|
Measure Sub-Category |
If you defined this Core Risk Measure as Additional, select the appropriate
sub-category.
If you selected the Educational Materials category, the following options are available:
If you selected the Controlled Access Programmes category, the following options are available:
Note: If you selected Direct Healthcare Professional Communications or Pregnancy Prevention Programmes, no sub-categories are available. |
Core Implementation Strategy |
Select the Core Implementation Strategy for the Core Risk Measure from the drop-down or select the Advanced Search (![]() If the drop-down is blank, you must first create a Core Implementation Strategy. |
Version | Enter the applicable version number for the Core Risk Measure. |
Based On | If applicable, select the Risk Measure record on which this Core Risk Measure record is based. |
Planned Start Date |
Enter the Risk Measure's expected start date.
Use the calendar to select the date or enter the date manually. |
Actual Start Date |
Enter the actual date the Risk Measure came into force.
Use the calendar to select the date or enter the date manually. |
Actual End Date |
Enter the actual date the Risk Measure ended.
Use the calendar to select the date or enter the date manually. |
Create Local Risk Measures
When the Create Local RMPs action creates Local Risk Management Plan Version records, these records inherit a copy of the Risk Measure records from their parent Core Risk Management Plan Version.
If required, complete the following steps to create additional Local Risk Measure records for a Local Risk Management Plan Version:
- Navigate to Risk Management > Local RMPs > [Local RMP].
- In the Local RMP Versions section, select the required Local RMP Version record. This is usually the latest version.
- In the Local Risks section, select the required Local RMP Risk record.
- In the Risk Measures section, create a record for each risk measure associated with the selected Local RMP Risk record:
- Select Create and in the Create RMP Risk Measure window, select Local Risk Measure.
- Complete the Local Risk Measure fields.
- Select Save.
- In the Documents section of the Local Risk Measure record, upload any related documents for the Risk Measure using the standard document creation process. Use the Risk Management > Risk Measure > Risk Measure Tool document type.
- In the Risk Measure Tracking section, select Create and complete the RMP Risk Measure Tracking fields.
- Select Save.
- Navigate back to the Local Risk Measure record using the [Local Risk Measure] link at the top of the page.
- Repeat steps 3 and 4 to create Local Risk Measure records for each additional RMP Risk record.
Local Risk Measure Fields
Field | Description |
---|---|
Name | Vault populates this field automatically. |
Minimized Risk |
To populate this field, you must first populate the RMP and RMP Version fields. Select the Minimized Risk value for the Local Risk Measure from the drop-down or select the Advanced Search (![]() |
Minimized Local Risk |
If Vault does not populate this field automatically, you may select the specific risk that this measure will help to minimize in the local market from the drop-down or select the Advanced Search (![]() |
Indication | Select the MedDRA term for the indication. |
Routine/Additional | Select whether the Local Risk Measure is Routine or Additional. |
Measure Category |
Select the type of risk minimization measure. The options available depend on the selection you made for the Routine/Additional field. The following options are available for routine Local Risk Measures:
The following options are available for additional Local Risk Measures:
|
Measure Sub-Category |
If you defined this Local Risk Measure as Additional, select the appropriate
sub-category.
If you selected the Educational Materials category, the following options are available:
If you selected the Controlled Access Programmes category, the following options are available:
Note: If you selected Direct Healthcare Professional Communications or Pregnancy Prevention Programmes, no sub-categories are available. |
Core Risk Measure |
Select the Core Risk Measure on which this Local Risk Measure is based from the drop-down or select the Advanced Search (![]() |
Market |
Select the Country to which this Local Risk Measure applies from the drop-down or select the Advanced Search (![]() |
Local Disposition |
Select how the Local Risk Measure will be used in the applicable region:
|
Version | Enter the applicable version number for the Local Risk Measure. |
Based On |
If applicable, select the Risk Measure record on which this Local Risk Measure record
is based from the drop-down or select the Advanced Search (![]() |
RMP |
Select the RMP for the Core Risk Measure from the drop-down or select the Advanced Search (![]() |
RMP Version |
Select the RMP Version for the Core Risk Measure from the drop-down or select the Advanced Search (![]() |
Local RMP | Vault populates this field automatically. |
Local RMP Version | Vault populates this field automatically. |
Core Implementation Strategy |
Select the Core Implementation Strategy for the Core Risk Measure from the drop-down or select the Advanced Search (![]() If the drop-down is blank, you must first create a Core Implementation Strategy. |
Local Implementation Strategy |
Select the Local Implementation Strategy that covers the development of this minimization tool from the drop-down or select the Advanced Search (![]() |
HA Submission Date |
Enter the date the Risk Measure was submitted to the health authority for endorsement.
Use the calendar to select the date or enter the date manually. |
HA Endorsement Date |
Enter the date the Risk Measure was endorsed by the health authority for use.
Use the calendar to select the date or enter the date manually. |
Planned Start Date |
Enter the Risk Measure's expected start date.
Use the calendar to select the date or enter the date manually. |
Actual Start Date |
Enter the actual date the Risk Measure started.
Use the calendar to select the date or enter the date manually. |
Actual End Date |
Enter the actual date the Risk Measure ended.
Use the calendar to select the date or enter the date manually. |
RMP Risk Measure Tracking Fields
Field | Description |
---|---|
Target Date |
Enter the target date for distribution of the Risk Measure. Use the calendar to select the date or enter the date manually. |
Target Completion Date |
Enter the expected tracking period end date for the Risk Measure. Use the calendar to select the date or enter the date manually. |
Target Value |
Enter the target numeric outcome of the Risk Measure. |
Outcome Verdict |
Select the evaluation of the actual outcome of the Risk Measure:
|
Channel |
Enter the distribution channel for the Risk Measure. |
Actual Date |
Enter the date that the outcome of the Risk Measure was recorded. Use the calendar to select the date or enter the date manually. |
Actual Completion Date |
Enter the date that the tracking period of the Risk Measure ended. Use the calendar to select the date or enter the date manually. |
Actual Value |
Enter the actual outcome of the Risk Measure. |